From May 2016 through November 2017, here is the completed renovation of my 1965 Shasta Super 18. Before | April 2016 ...
The Final Weeks
After realizing it's been awhile since I've posted, I wanted to do a final update before the reveal. I've since got the camper from the...
WEEK FIFTY-NINE, SIXTY & SIXTY-ONE: Flooring, Upholstery & Out to the Shop
Flooring The original plan was to use the LVT tile to do a custom inlay in the floor. The new plan consisted of scratching that for a...
WEEK FIFTY-SIX, -SEVEN & -EIGHT: Roof Completion, Exterior Trim and Misc. Interior Work
Roof The past few weeks have been almost entirely focused on closing up the exterior. Access doors, drain plugs, and most importantly:...
WEEK FIFTY-FOUR & FIFTY-FIVE: Roof and Stereo Wiring
Roof Quick post this week as I make a few big steps and close out a bunch of small work on the interior. Roof work previously completed:...
WEEK FIFTY-TWO & FIFTY-THREE: AC, Cabinetry & Trim
Air Conditioner While it wasn't in my original plan, an air conditioner was incorporated along the way after some difficult summer work...