Electrical Prep
Began locating fixtures in preparation for electrical install. The goal is to keep wire runs short and easily accessible from the inside so switches/outlets will be located in cabinetry.
Bathroom Build
Time spent debating the best way to move forward with bathroom framing. Moving forward with integrated vertical support for the toilet 'floor' (option A below). 'Floor' will consist of 1" plywood base with applied wood veneer, reminiscent of the dinette table top. New toilet flange purchased. Wall framing in process.
Kitchen Progress
Wood backsplash installed, corner trim piece cut and framing added for stove hood.