top of page

WEEK TWENTY-SEVEN: Bathroom Door & More Shelving

Bathroom Door

Using the existing bathroom door, I removed the old paneling and added additional framing for the window. Door faced with 1/32" Okoume veneer (same finish as the ceiling panels) on the cabin side and sheet metal on the shower side (metal side trim and sealing still in process). Stained glass window from previous post faced with decorative film for view obstruction and installed. Stripped the paint from existing hardware and works like new.

Built-in Shelves

Finished building the three shelves for the kitchen/bedroom. Since all were built with pine, currently working on matching the stain to the Okoume ceiling panels.


bottom of page