WEEK THIRTY-TWO: Toilet Flange Demise & More Routing
Toilet Flange The amazing Peter Flanders of Ocean Breeze RV returned later this week to help with the stubborn toilet flange I haven't...
WEEK THIRTY-ONE: Stove Hood, Windows & RV Consultation
Stove Hood The original stove hood was rusted, chipping paint and the screen on the sliding vent was deteriorating. A steel buffing wheel...
WEEK THIRTY: Shelving & Electrical Equipment
Shelving Kitchen built-ins stained and installed. Electrical Cont.'d Equipment purchased includes electrical panel, switches, light...
WEEK TWENTY-NINE: Flooring & RV Electrical Systems
Flooring LVT flooring inlay cut and assembled in preparation for future install. I was surprised to find that after scoring the plank...
WEEK TWENTY-EIGHT: Dinette Table
Dinette Table This week was spent refurbishing the dining table. Instead of rebuilding it entirely I removed the damaged veneer on the...
WEEK TWENTY-SEVEN: Bathroom Door & More Shelving
Bathroom Door Using the existing bathroom door, I removed the old paneling and added additional framing for the window. Door faced with...
WEEK TWENTY-SIX: Interior Renders, Cabinetry & Hardware
Plans diverted due to a pretty cold New England winter (pretty cold meaning a propane heater couldn't compensate for poor building...
WEEK TWENTY-FIVE: 3D Modeling & Holiday Hiatus
Impending work deadline + busy holiday = essentially no work done this week. Happy (belated) Thanksgiving! 3D Modeling I managed to set...
WEEK TWENTY-FOUR: Plumbing, Plumbing, Plumbing...
Shower & Black Water Tank Piping This week was all about rebuilding the piping for the shower drain and black water tank. After FINALLY...
WEEK TWENTY-THREE: Cabinets, Aluminum Backsplash & More Plumbing
Refrigerator Cabinet Housing for the refrigerator framed in. I cut the hole for the vent and laid out the framework for the cabinetry....